5. Complete the Installation
Carefully remove the protective tape from the bath rim.
Cover the framing with water-resistant wall material.
Apply a bead of silicone sealant in the groove between the edge of the bath deck
and the water-resistant wall material.
Tape and mud the water-resistant wall material.
NOTICE: When selecting finished wall material, do not exceed 1-1/2 (3.8 cm)
thickness. This will ensure the finished wall material will overlap the integral apron
columns.
Install the finished wall material 1/4 (6 mm) above the bath deck. This will create
a groove to apply the silicone sealant.
Apply a bead of silicone sealant in the groove between the finished wall and the
rim.
NOTICE: When selecting finished floor material, do not exceed 2 (5.1 cm) thickness.
This will ensure the integral apron will be flush with the finished floor.
Install the finished floor material.
2x4 Studding
Montant 2x4
Postes de 2x4
Water-Resistant Wall
Material
Matériau
hydrorésistant du mur
Material de pared
resistente al agua
Silicone Sealant
Mastic à la silicone
Sellador de silicona
Nailing-In Flange
Bride de cloutage
Reborde de clavado
Furring Strip
Tasseau
Listón de enrasar
Finished Wall Covering
Revêtement de mur fini
Revestimiento de la
pared acabada
Kohler Co. 13 1084213-2-A
Vista de pagina 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 19 20

Comentarios a estos manuales

Sin comentarios