Kohler K-2356-8-96 Guía de instalación Pagina 3

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 2
Preparation (cont.)
Cut out the template where indicated for the countertop opening.
Cut along the inside of the cutting line.
Position the template on the countertop to ensure clearance
between the lavatory, faucet, and backsplash.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
Kohler Co. 3 1018888-2-E
Vista de pagina 2
1 2 3 4 5 6 7 8 ... 15 16

Comentarios a estos manuales

Sin comentarios