Kohler K-9516-CP Guía de instalación Pagina 9

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 20
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 8
1. Slide Bar Installation
Using the escutcheon, mark the mounting holes for the bottom bracket onto the
wall.
Mark the centerlines for the top bracket mounting holes. Refer to the illustration
above for measurements.
Verify the marked locations are both level and plumb.
Verify all marked locations are over a stud or other sufficient backing.
IMPORTANT! Predrill through the wall surface only, not into the studs.
Using a 3/16 drill bit, predrill at each marked location.
NOTE: The slide bar can be installed with or without the escutcheons.
Secure the escutcheon (optional) and bottom bracket with the three screws.
Press the cover onto the bottom bracket.
Installation Barre coulissante
Utiliser l’applique et marquer les trous de fixation pour le support inférieur sur le
mur.
Marquer les lignes centrales pour les trous de fixation du support supérieur. Voir
l’illustration ci-dessus pour les mesures.
Vérifier que les emplacements marqués sont à niveau et d’aplomb.
Vérifier que tous les emplacements marqués se trouvent par-dessus un goujon ou
un autre renfort suffisant.
Bracket
Support
Soporte
Escutcheon
Applique
Chapetón
Cover
Couvercle
Tapa
22-7/16"
(57cm)
23-3/4"
(60.3 cm)
Escutcheon
Applique
Chapetón
Kohler Co. 9 1148058-2-A
Vista de pagina 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 19 20

Comentarios a estos manuales

Sin comentarios