Kohler K-2322-4-47 Guía de instalación Pagina 4

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 3
Preparation (cont.)
Mark a line at the front of the pedestal.
Carefully remove the lavatory from the pedestal and set aside. Move
the pedestal from the area.
Measure a distance of 5 (12.7cm) from the line at the front of the
pedestal toward the wall and mark the floor. This is the location of
the pedestal mounting hole.
1020685-2-B 4 Kohler Co.
Vista de pagina 3
1 2 3 4 5 6 7 8 9 ... 15 16

Comentarios a estos manuales

Sin comentarios