1. Prepare the Site
Concrete Construction
NOTICE: Adequate floor support must be provided. Consult the roughing-in sheet packed with your
whirlpool for specific floor loading requirements.
CAUTION: Risk of product damage. Do not support the whirlpool by the rim.
Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is
flat and level.
The whirlpool should be installed in an alcove installation (a drop-in installation is also acceptable).
Install an access panel to allow the pump to be serviced.
Construct brick or concrete supports. When installing with two walls, the supports on the flanged
side of the whirlpool should rise to the top of the flange.
Position the plumbing according to the roughing-in information packed. Cap the supplies, and
check for leaks.
Brick
Bath
1/16"
(2 mm)
Tile
Approved
Tile Backing
Tile
Approved Tile Backing
Brick
Raise the sidewall to the
height of the flange.
Install an access panel to allow
the pump to be serviced.
Drop-In Installation
Alcove Installation
Typical
access
panel
Typical
access
panel
Kohler Co. 5 1019484-2-F