Kohler K-45903-2BZ Guía de instalación Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 56
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
7. Secure the Shower Column
Reinstall the shower column to the supply adapters.
Rotate the top escutcheon until the hole aligns with the screw
hole. Thread the screw into place. Repeat for the second screw.
Rotate the bottom escutcheon until the hole aligns with the screw
hole. Thread the screw into place. Repeat for the second screw.
Install a plug button in the hole in each escutcheon.
Rotate each escutcheon so the plug button is located behind the
shower rail.
Apply a bead of silicone sealant to the back edge of each
escutcheon.
Slide the escutcheons over the mounting collars and press the
escutcheons tight against the finished wall.
Wipe away any excess silicone sealant from the escutcheons and
finished wall.
Apply
silicone
sealant.
Hole
1188076-2-A 14 Kohler Co.
Vista de pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 55 56

Comentarios a estos manuales

Sin comentarios