
3. Install the Supply Piping – Multiple Supplies
Route the water supply lines.
Use the provided soldering template to construct the pressure
balancing loops.
Position tees in the loops over each of the four raised locations on
the template.
Solder the assembly while it is attached to the template.
IMPORTANT! To ensure proper alignment of the tees with the
product, the two pressure balancing loops must be rigidly connected
to each other while on the soldering template.
While still on the soldering template, rigidly connect the two
pressure balancing loops to each other.
Remove the pressure balancing loop assembly from the template.
Connect the pressure balancing loops to the water supplies.
Do not strap the pipes.
Temporarily install a nipple to each tee. Do not use any sealant.
Pressure
Balancing
Loops
1/2" NPT Nipple
Soldering
Template
Clamp each tee
to the template
during soldering.
Rigidly connect
to each other.
Ø 9-5/8"
(244 mm)
6-3/4"
(172 mm)
Soldering Template
6-3/4" (172 mm)
Kohler Co. 9 1207716-2-C
Comentarios a estos manuales